Brisbane · South East Queensland · Development guide

Building a new house in Brisbane: rules, approval and what the data shows

Zone rules from Brisbane City Plan 2014 plus real outcomes from decided Brisbane council applications. Data current as of 26 July 2026.

According to Casa Intelligence analysis of 9,115 decided dwelling-house applications in Brisbane, 93% were approved, with a median decision time of 49 days.

93%

Approval rate

8,471 of 9,115 decided applications

49 days

Median decision time

Lodgement to decision (n=9,102)

9,115

Decided applications

Comparable dwelling-house applications

20

Zones tracked

Rules from Brisbane City Plan 2014

Do you need council approval for a new house (including knockdown-rebuild) in Brisbane?

Queensland's Planning Act 2016 sorts development into three assessment categories: accepted development (no development application needed if you meet the stated requirements), code assessable (a DA assessed against the planning scheme's codes, no public notification), and impact assessable (a DA with public notification and third-party appeal rights). Which category applies to your project is set by Brisbane City Plan 2014 — and it depends on your zone, any precinct that applies, and the overlays on your lot.

A new house on a standard residential lot usually does not need a planning approval — building approval (through a private certifier) is the main process. But the exceptions are exactly what the decided applications on this page are: character and heritage overlays, small or irregular lots, steep or flood-affected land, and non-standard zones can each turn a new house or knockdown-rebuild into a development application under Brisbane City Plan 2014.

None of this is answerable with certainty at council level — the pathway for your project is set by your lot's zone, precinct and overlays together. A free Casa block check reads those for your exact address in seconds.

New house rules by zone in Brisbane

Zone-level provisions from Brisbane City Plan 2014. Zone rules are the starting point — precinct mapping and overlays can tighten them for individual lots.

ZoneMax heightSite coverSetbacks (front / side / rear)
Community Facilities15 m / 3 storeys60%0 m / 0 m / 3 m
Conservation8.5 m / 1 storeys5%10 m / 5 m / 6 m
Character Residential9.5 m / 2 storeys50%6 m / 1.5 m / 3 m
District Centre25 m / 8 storeys80%0 m / 0 m / 3 m
Emerging Community9.5 m / 2 storeys50%6 m / 1.5 m / 3 m
Environmental Management8.5 m / 2 storeys10%10 m / 5 m / 6 m
High Density Residential28 m / 8 storeys60%6 m / 3 m / 6 m
Industry15 m / 3 storeys75%3 m / 0 m / 3 m
Low Density Residential9.5 m / 2 storeys50%6 m / 1.5 m / 3 m
Low Impact Industry12 m / 3 storeys75%6 m / 0 m / 3 m
Low-Medium Density Residential9.5 m / 3 storeys50%6 m / 2 m / 3 m
Medium Density Residential15 m / 5 storeys50%6 m / 3 m / 3 m
Mixed Use25 m / 8 storeys80%0 m / 0 m / 3 m
Open Space8.5 m / 2 storeys10%6 m / 1.5 m / 3 m
Principal Centre60 m / 15 storeys90%0 m / 0 m / 3 m
Priority Development Area30 m / 8 storeys70%6 m / 1.5 m / 3 m
Rural Residential8.5 m / 2 storeys30%10 m / 5 m / 10 m
Rural8.5 m / 2 storeys10%10 m / 5 m / 6 m
Special Purpose15 m / 4 storeys60%6 m / 1.5 m / 3 m
Sport and Recreation12 m / 2 storeys20%6 m / 1.5 m / 3 m

“—” means the value is not recorded in our rules dataset, not that no rule exists. Always confirm against the current planning scheme before relying on a figure.

How new-house applications have fared in Brisbane

Across 9,115 decided dwelling-house applications recorded against Brisbane council, 8,471 were approved — an approval rate of 93%. That reflects a strong track record for this kind of proposal. These are real, decided applications assessed by the council, not estimates or modelling.

The median time from lodgement to decision was 49 days (measured across the 9,102 applications in this cohort with both dates recorded). That is a comparatively fast assessment turnaround. Individual applications vary widely with information requests, referrals and the assessment pathway for the specific site.

We do not hold enough charged decision notices in this cohort to publish a median infrastructure charge for Brisbane. As a statutory ceiling, Queensland caps adopted charges at $36,670.70 per three-or-more-bedroom dwelling or lot (2025–26 indexed) — an upper bound, not an estimate for your project.

Recent new-house decisions in Brisbane

The most recent decided dwelling-house applications in this cohort, cited by real council application number so you can verify each one yourself.

ApplicationDecisionDecidedDays to decision
A006918272Refused19 May 2026162 days
A007011439Withdrawn14 May 202616 days
A007011028Withdrawn14 May 202617 days
A006964520Approved1 May 202670 days
A006989464Approved1 May 202635 days

New house in Brisbane: common questions

Do I need council approval for a new house (including knockdown-rebuild) in Brisbane?

It depends on your lot's zone, precinct and overlays under Brisbane City Plan 2014. Queensland sorts development into accepted (no DA if requirements are met), code assessable (DA without public notification) and impact assessable (DA with public notification). Some compliant proposals of this type proceed without a planning application, others need a full DA. The only reliable way to know your pathway is to check your specific address.

What is the approval rate for new house (including knockdown-rebuild) applications in Brisbane?

93% of the 9,115 decided dwelling-house applications recorded against Brisbane council were approved (median 49 days to decision). Figures are indicative, derived from decided council records; past decisions do not guarantee future outcomes.

How long does new house (including knockdown-rebuild) approval take in Brisbane?

The median time from lodgement to decision across the 9,102 dated applications in this cohort was 49 days. Individual applications vary with information requests, referrals and the assessment pathway that applies to the site.

About this guide

Zone rules on this page are drawn from Brisbane City Plan 2014 as recorded in our dataset, and application statistics from decided development applications recorded against Brisbane council, current as of 26 July 2026. Planning schemes are amended over time and precincts, neighbourhood plans and overlays can vary the rules for individual lots. Past decisions describe how comparable proposals have fared — they do not guarantee, and cannot predict, the outcome of any future application. This page is general information, not planning or legal advice.

Free block check

Would your block qualify? Check your exact address — free.

Council-level rules tell you the framework. A free block check reads the zone, precinct and overlays for your address: Casa Score, zone and overlay position, in seconds.

Check your block — free

Free

Enter any SEQ address for an instant snapshot: your block’s Casa Score, zone and overlay position — before you spend anything.

No sign-up needed · Covers 7 SEQ councils · Instant result

For your specific address

Find out what these rules mean for your site

This guide covers Brisbane at council level. A Preliminary Planning Report covers your address: approval likelihood, code vs impact pathway, constraints, costs and comparable approved DAs — prepared by a qualified development professional (Master of Architecture) and delivered in minutes.