Sunshine Coast · South East Queensland · DA statistics

Building a duplex in Kuluin: approval rates, timelines and costs

Real outcomes from 40 decided dual-occupancy and duplex applications on Kuluin properties, drawn from Sunshine Coast council records. Data current as of 26 July 2026.

Check a Kuluin block for duplex potential — free, instant.

Zone, overlays and what your address could support — no sign-up to run a check.

According to Casa Intelligence analysis of 40 decided applications in Sunshine Coast, 95% of duplex and dual-occupancy applications in Kuluin were approved, with a median decision time of 61 days.

95%

Approval rate

38 of 40 decided applications

61 days

Median decision time

Lodgement to decision (n=40)

40

Decided applications

Comparable dual-occupancy and duplex applications

27 Jan 2026

Latest decision

Most recent decided application in this cohort

What the numbers say about Kuluin

Across 40 decided dual-occupancy and duplex applications on Kuluin properties, 38 were approved — an approval rate of 95%. That reflects a strong track record for this kind of proposal. These are real, decided applications assessed by the Sunshine Coast council, not estimates or modelling.

The median time from lodgement to decision was 61 days (measured across the 40 applications in this cohort with both dates recorded). That is a fairly typical assessment timeframe for South East Queensland. Individual applications vary widely with information requests, referrals and the assessment pathway that applies to the specific site.

Based on 40 decided applications in Sunshine Coast, these figures describe how comparable proposals have actually fared — but every site is different. Zoning, overlays, lot dimensions and the assessment pathway for your specific parcel decide what is realistic for your project.

Recent decisions in Kuluin

The most recent decided dual-occupancy and duplex applications in this cohort, cited by real council application number so you can verify each one yourself.

ApplicationDecisionDecidedDays to decision
MCU25/0331Approved27 Jan 202669 days
OPW25/0528Approved27 Jan 202669 days
MCU25/0107Approved2 July 202558 days
OPW25/0166Approved2 July 202558 days
MCU24/0338Approved10 Apr 2025120 days

About this data

These statistics summarise decided development applications recorded against Kuluin properties in Sunshine Coast council records, current as of 26 July 2026. Past decisions describe how comparable proposals have fared — they do not guarantee, and cannot predict, the outcome of any future application. Council assesses every application on its merits against the planning scheme that applies at the time. This page is general information, not planning or legal advice: what is achievable on a specific site depends on its zoning, overlays, lot dimensions and assessment pathway.

Free block check

Own a block in Kuluin? Check where it stands — free.

The statistics above describe the suburb. A free block check tells you about your address: Casa Score, zone and overlay position, in seconds.

Check your block — free

Free

Enter any SEQ address for an instant snapshot: your block’s Casa Score, zone and overlay position — before you spend anything.

No sign-up needed · Covers 7 SEQ councils · Instant result

For your specific address

Find out what these numbers mean for your site

Suburb statistics tell you the odds. A Preliminary Planning Report tells you where your address stands: approval likelihood, code vs impact pathway, constraints, costs and comparable approved DAs — prepared by a qualified development professional (Master of Architecture) and delivered in minutes.