Sunshine Coast · South East Queensland · DA statistics

Building a granny flat in Maroochy River: approval rates, timelines and costs

Real outcomes from 9 decided secondary dwelling (granny flat) applications on Maroochy River properties, drawn from Sunshine Coast council records. Data current as of 8 July 2026.

According to Casa Intelligence analysis of 9 decided applications in Sunshine Coast, 56% of granny flat and secondary dwelling applications in Maroochy River were approved, with a median decision time of 62 days.

56%

Approval rate

5 of 9 decided applications

62 days

Median decision time

Lodgement to decision (n=9)

9

Decided applications

Comparable secondary dwelling (granny flat) applications

6 Mar 2025

Latest decision

Most recent decided application in this cohort

What the numbers say about Maroochy River

Across 9 decided secondary dwelling (granny flat) applications on Maroochy River properties, 5 were approved — an approval rate of 56%. That reflects a noticeably tougher track record than most SEQ suburbs, so site selection and application quality matter more here. These are real, decided applications assessed by the Sunshine Coast council, not estimates or modelling.

The median time from lodgement to decision was 62 days (measured across the 9 applications in this cohort with both dates recorded). That is a fairly typical assessment timeframe for South East Queensland. Individual applications vary widely with information requests, referrals and the assessment pathway that applies to the specific site.

Based on 9 decided applications in Sunshine Coast, these figures describe how comparable proposals have actually fared — but every site is different. Zoning, overlays, lot dimensions and the assessment pathway for your specific parcel decide what is realistic for your project.

Recent decisions in Maroochy River

The most recent decided secondary dwelling (granny flat) applications in this cohort, cited by real council application number so you can verify each one yourself.

ApplicationDecisionDecidedDays to decision
MCU25/0001Approved6 Mar 202557 days
MCU24/0225Approved24 Sept 202435 days
MCU23/0250Withdrawn28 Nov 202376 days
MCU22/0041Withdrawn11 May 202287 days
MCU21/0467Approved30 Mar 2022106 days

About this data

These statistics summarise decided development applications recorded against Maroochy River properties in Sunshine Coast council records, current as of 8 July 2026. Past decisions describe how comparable proposals have fared — they do not guarantee, and cannot predict, the outcome of any future application. Council assesses every application on its merits against the planning scheme that applies at the time. This page is general information, not planning or legal advice: what is achievable on a specific site depends on its zoning, overlays, lot dimensions and assessment pathway.

Free block check

Own a block in Maroochy River? Check where it stands — free.

The statistics above describe the suburb. A free block check tells you about your address: Casa Score, zone and overlay position, in seconds.

Check your block — free

Free

Enter any SEQ address for an instant snapshot: your block’s Casa Score, zone and overlay position — before you spend anything.

No sign-up needed · Covers 7 SEQ councils · Instant result

For your specific address

Find out what these numbers mean for your site

Suburb statistics tell you the odds. A Preliminary Planning Report tells you where your address stands: approval likelihood, code vs impact pathway, constraints, costs and comparable approved DAs — prepared by a qualified development professional (Master of Architecture) and delivered in minutes.